Proposed installation and anchoring
The ambition is a maintainable diversion system with minimal habitat disturbance. The model illustrates an approach to evaluate, not installation instructions.
Survey and design
Site selection needs bathymetry, seabed and habitat surveys, current and wave conditions, navigation review and community coordination. The source proposal discusses offshore placement and road-end collection pockets; neither a location nor a collection site is confirmed.
Helical ground screws and elevated anchor lines are proposed to reduce seabed contact. Anchor capacity, spacing, line geometry, corrosion and loads need site-specific engineering and controlled validation. Dimensions shown in the model remain source assumptions.
Responsible collection
The project aims for prompt collection and responsible handling so captured weed does not become an unmanaged accumulation. A workable plan must identify authorized operators, monitoring, safe handling, transport, a suitable approved destination and funding.
Coordination with existing initiatives is proposed. No disposal site, permit, operator or partnership is represented as settled here.
Weather and removal planning
Design review must establish weather limits, inspection intervals, decision authority and a feasible retrieval plan. The goal is timely, safe removal when needed; no guaranteed storm resistance or removal time is claimed.