The Hopkins diversion boom
A proposed modular boom aims to guide floating sargassum toward managed collection points, reduce beach accumulations, and protect the coast that Hopkins depends on.

The concept
Twin six-inch PVC floats, a raised barrier and a mesh skirt form a proposed ten-foot module. Linked modules would aim to divert weed while allowing water to pass through. Buoyancy, loads, durability and wildlife interactions remain to be tested.
Protecting marine life
Protecting turtles, seagrass and coral is a core goal. The proposed raised lines and shallow skirt aim to reduce contact and entanglement risks. Habitat surveys, ecological review, monitoring and stop-work criteria must establish whether this approach is appropriate at a specific site.
Proposed stages
- An initial 20–30 ft prototype test, subject to required review and approvals.
- A conditional 200–300 ft proof section if the prototype evidence supports proceeding.
- Later expansion only with evidence, approvals, operational capacity and funding.
Project status — 22 October 2026
The learning hub and interactive viewer present a concept for discussion. Incorporation, bank readiness, funding and partner commitments have not been verified complete. No grant award, approved engineering design or agreed collection operator is announced here.
The project seeks coordination with existing community and sargassum initiatives. Proposed collection locations, handling, transport and disposal arrangements need agreement and approval before use.