Questions and glossary
What are we trying to achieve?
Reduce beach accumulations through managed diversion and collection while protecting wildlife, seagrass and community access. Testing must measure both benefits and unintended effects.
Is this engineering-approved?
No. The six-inch-float model is a discussion concept. Dimensions, materials and load paths need independent review and testing.
Why do skirt dimensions differ?
The source overview uses 24 inches; the viewer uses 30 inches within a 24–39 inch source range. These are source variants, not approved operating limits. The geometry has not been silently reconciled.
Where would collected weed go?
A suitable destination and handling arrangements must be agreed and approved. Road-end collection pockets are a proposal, not confirmed disposal locations.
When could it expand?
An initial 20–30 ft prototype test is proposed, followed conditionally by a 200–300 ft proof section. Further expansion depends on evidence, approvals, funding and operating capacity.
What happens to checklist ticks?
They are stored only in this browser using localStorage, with no synchronization. Reset clears this checklist on this device. Ticks are personal planning notes, not certification or project approval.
Useful terms
Freeboard: height above the waterline. Skirt: mesh below the floats. Load path: the route forces take through components. Helical ground screw: a proposed screw-shaped seabed anchor. These terms describe the concept, not verified performance.